The bridge was built and being put together through a process Acclerated Bridge Construction also known as ABC. 

This is where pieces of the bridge is built off site and then transported to the location to be put together. 

This process is frequently used during construction projects to reduce traffic and lane closures.

The bridge underwent a stress test right before it collapsed.

The National Transportation Safety Board is currently investigating.